Project Duration (3D modelling, Fabrication & Installation): Approx 12 weeks Architect: ROAR This was a difficult and testing project. This required the installation of over 9 tonnes of 16mm plate into a house that was near completion.
Find Out MoreProject Duration (Fabrication & Installation): Approx. 6 months design and installation Affectionately known as the ‘Screen House’, locals have come to admire and are intrigued by the simplicity and volume of the screens covering this home.
Find Out MoreProject Duration (3D modelling, Fabrication & Installation): Approx. 6 weeks Builder: Consulted Projects This roof structure is for an industrial building located in Sydney’s southwest. It required a clear span to provide unhindered floor space for the proposed gym site.
Find Out MoreThis site is situated on the lower floor of a warehouse/office conversion in Sydney’s inner west. The client’s brief was to maximise lettable space and create something that was ‘visually appealing’.
Find Out MoreBuilder MAC Developments, The architect firm- Innovate, were after a ‘rustic’ look partition made from steel and coated clear to frame the two meeting rooms in their revamped office.
Find Out MoreMAM Engineering has been involved in the supply and installation of multiple buildings via different buildings companies. The entirety of both projects has been 3D modelled internally with approval by the clients prior to the fabrication process.
Find Out MoreFabrication started in February 2022 and the installation of the first floor in May. Progress is quick when possible but major rain delays have impacted progress. Here are some progress photo’s.