Year: 2020 – 2021
Location: Georges River Council (Oatley Park & Edgbaston Park)
Materials: Hot Dipped Galvanised Steel
Project Duration (3D modelling, Fabrication & Installation): Approx. 7 weeks

 

Over the last two year, upgrades to local council amenities in the Georges River Council has seen many new facilities utilising structural steel portal frames.

MAM Engineering has been involved in the supply and installation of multiple buildings via different buildings companies. The entirety of both projects has been 3D modelled internally with approval by the clients prior to the fabrication process. This modelling process takes approximately 2-3 weeks and an additional 2-3 weeks for fabrication and galvanising. For the portals sized as pictured, the installation time was 1 week.