Year: 2020
Location: Beaconsfield, Sydney
Materials: Structural Steel

Project Duration (3D modelling, fabrication & Installation): 4 weeks, This site is situated on the lower floor of a warehouse/office conversion in Sydney’s inner west. The client’s brief was to maximise lettable space and create something that was ‘visually appealing’. The structure is made from a series of 380 PFCs and 310UC158 beams attached to two concrete columns, and a slab edge creating an additional 140m 2 of floating office space. The concrete columns were scanned to ensure that none of the proposed structural bolts would interfere with the reinforcement and undermine their integrity.


Year: 2021
Location: Highland Property Agents Cronulla, Office
Materials: Raw/untreated Steel

Project Duration (fabrication & Installation): 2 days Builder MAC Developments, The architect firm- Innovate, were after a ‘rustic’ look partition made from steel and coated clear to frame the two meeting rooms in their revamped office. The slimline sliding door setup was achieved using the Brio Zero track and accessories.


Year: 2020 – 2021
Location: Georges River Council (Oatley Park & Edgbaston Park)
Materials: Hot Dipped Galvanised Steel

Project Duration (3D modelling, Fabrication & Installation): Approx. 7 weeks Over the last two year, upgrades to local council amenities in the Georges River Council has seen many new facilities utilising structural steel portal frames. MAM Engineering has been involved in the supply and installation of multiple buildings via different buildings companies. The entirety of both projects has been 3D modelled internally with approval by the clients prior to the fabrication process. This modelling process takes approximately 2-3 weeks and an additional 2-3 weeks for fabrication and galvanising. For the portals sized as pictured, the installation time was 1 week.