admin July 18, 2022

Project: The Bastion Project

Site: The Bastion, Castlecrag NSW

Architect: CastlePeake

Engineer:  Hyve Designs

Builder:  Parkzip Constructions

Budget:  $100k +

Tonnage:  7T

Installation:  MAM Engineering

Overview:    MAM Engineering has had a long, successful history with both the architect and builder. Prior experience ensured MAM was entrusted with the shop drawings and fabrication. The shop drawing process was an arduous task due to the complicated connection details necessary to execute the beautiful design by Castlepeake. The fabrication involved a complex ‘twisted steel’ layout.

Fabrication started in April 2022 and installation of the main roof was completed mid-May.