admin May 29, 2022

Project: Residential – Steel House Grays Point.

Site: Grays Point Rd, Grays Point.

Client: Private

Budget: $200k +

Tonnage: 15T

Installation: MAM Engineering

Overview: This project commenced in 2019 when MAM Engineering were commissioned to supply the 3D modelling and shop drawings by the client. Due to the difficult site progress was slow and required the garage slab to be built first for our crane to be suitably positioned.

Due to the proximity of the location to water, all materials were required to be Hot dipped Galvanised (HDG) to adequately protect the steel from the corrosive environment for the life of the home. This is a costly process but will give the steel the 50+ years of service as required.

Fabrication started in February 2022 and installation of the first floor in May. Progress is quick when possible but major rain delays have impacted progress. Here are some progress photo’s.

Design or budget questions?

Talk to us for free answers
GET A FREE QUOTE